Analisis Manajemen Risiko TI Menggunakan Framework COBIT 5 Domain APO12 dan EDM03


Authors

  • Al Fajri Universitas Islam Negeri Sultan Syarif Kasim Riau, Pekanbaru, Indonesia
  • Novriyanto Universitas Islam Negeri Sultan Syarif Kasim Riau, Pekanbaru, Indonesia
  • Nazruddin Safaat H Universitas Islam Negeri Sultan Syarif Kasim Riau, Pekanbaru, Indonesia
  • Muhammad Affandes Universitas Islam Negeri Sultan Syarif Kasim Riau, Pekanbaru, Indonesia

DOI:

https://doi.org/10.30865/klik.v4i3.1396

Keywords:

COBIT 5; APO12; EDM03; Capability Level; Risk Management

Abstract

PT Perkebunan Nusantara V Pekanbaru is a state-owned enterprise or BUMN, operating in the field of oil palm and rubber plantations located in the city of Pekanbaru, Riau Province, PTPN V has utilized information technology in running the organization and business processes therein, there are risks- risks that will disrupt the application of information technology and even be detrimental to the company, such as the risk of technical specification errors, the risk of errors in self-estimated price calculations (HPS), the risk of errors in the Work Plan and Requirements (RKS) documents and the risk of server failure or network failure. Risk management is an effort for PTPN V as the basis for infrastructure in good risk management governance, the research was carried out with the aim of being able to carry out information technology risk management analysis and provide recommendations to harmonize risk management in information technology processes, using the COBIT 5 framework and appropriate domains, namely the APO12 and EDM03 domains, The data needed in this research is in the form of secondary data and primary data, in the EDM03 domain it is known that the capability value is 4.56, which means the company has reached capability level 5 (optimizing process), in the APO12 domain it is known that the capability value is 4.43, which means The company has achieved capability level 4 (predictable process). Recommendations are given for processes in the APO12 domain as the domain used for risk management, while for the EDM03 domain process as the domain for risk optimization in the procurement and IT sections of PTPN V Pekanbaru

Downloads

Download data is not yet available.

References

H. Maulida Kurnia and R. Nur Shofa, “AUDIT TATA KELOLA TEKNOLOGI INFORMASI MENGGUNAKAN FRAMEWORK COBIT 5 BERDASARKAN DOMAIN APO12 Penulis Korespondensi,” Tasikmalaya, Indonesia. doi: 10.24176/sitech.v1i2.2723.

M. P. Wibawa and A. D. Manuputty, “Analisis Manajemen Risiko Teknologi Informasi Policy Service PT. Asuransi Sinar Mas Menggunakan Framework COBIT 5,” JATISI (Jurnal Tek. Inform. dan Sist. Informasi), vol. 7, no. 3, pp. 466–479, 2020, doi: 10.35957/jatisi.v7i3.409.

O. Purwaningrum, B. Nadhiroh, and S. Mukaromah, “Literature Review Audit Sistem Informasi Menggunakan Kerangka Kerja Cobit 5,” J. Inform. dan Sist. Inf., vol. 2, no. 3, pp. 587–595, 2021, doi: 10.33005/jifosi.v2i3.409.

K. Imtihan, M. Rodi, M. Ashari, M. T. A. Zaen, and K. Marzuki, “Audit Tata Kelola Teknologi Informasi Menggunakan Framework Cobit 4.1,” MATRIK J. Manajemen, Tek. Inform. dan Rekayasa Komput., vol. 21, no. 2, pp. 267–274, 2022, doi: 10.30812/matrik.v21i2.1569.

P. P. Thenu, A. F. Wijaya, and C. Rudianto, “Analisis Manajemen Risiko Teknologi Informasi Menggunakan Cobit 5 (Studi Kasus: Pt Global Infotech),” J. Bina Komput., vol. 2, no. 1, pp. 1–13, 2020, doi: 10.33557/binakomputer.v2i1.799.

M. A. G. Wattimena and A. R. Tanaamah, “Analisis Manajemen Risiko Teknologi Informasi Menggunakan COBIT 5 (Studi Kasus: TSI/Teknologi dan Sistem Informasi Perpustakaan UKSW),” J. Inf. Syst. Informatics, vol. 3, no. 3, pp. 483–498, 2021, doi: 10.51519/journalisi.v3i3.183.

A. Pinem, E. S. Panjaitan, and A. Andri, “Analisis Risiko Teknologi Informasi Menggunakan Metode FMEA dan SAW dengan COBIT 5,” J. Media Inform. Budidarma, vol. 5, no. 4, p. 1688, 2021, doi: 10.30865/mib.v5i4.3275.

ISACA, Process Assessment Model (PAM): Using COBIT 5 of Enterprise IT. 2013. [Online]. Available: http://linkd.in/ISACAOfficial

ISACA, Enabling Processes. 2012.

R. Nurhidayat and S. Handayaningsih, “Analisis Manajemen Risiko Pada Layanan Pengunduran Diri Mahasiswa Menggunakan Framework COBIT 5 Fokus Pada Mengelola Risiko (APO12),” JSTIE (Jurnal Sarj. Tek. Inform., vol. 7, no. 1, p. 69, 2019, doi: 10.12928/jstie.v7i1.15806.

D. A. Prastiyawan, A. Ambarwati, and E. Setiawan, “Analisis Manajemen Risiko Layanan Sistem Manajemen Dealer Menggunakan COBIT 5,” Matrix J. Manaj. Teknol. dan Inform., vol. 10, no. 2, pp. 43–49, 2020, doi: 10.31940/matrix.v10i2.1913.

F. Muttaqin, M. Idhom, F. A. Akbar, M. H. P. Swari, and E. D. Putri, “Measurement of the IT Helpdesk Capability Level Using the COBIT 5 Framework,” J. Phys. Conf. Ser., vol. 1569, no. 2, pp. 39–46, 2020, doi: 10.1088/1742-6596/1569/2/022039.

N. Z. Firdaus and Suprapto, “Evaluasi Manajemen Risiko Teknologi Informasi Menggunakan COBIT 5 IT Risk (Studi Kasus?: PT . Petrokimia Gresik),” J. Pengemb. Teknol. Inf. dan Ilmu Komput., vol. 2, no. 1, pp. 1–10, 2018, [Online]. Available: https://j-ptiik.ub.ac.id/index.php/j-ptiik/article/view/702

I. Zakkadiaksa, B. T. Hanggara, and B. S. Prakoso, “Evaluasi Manajemen Resiko Teknologi Informasi Menggunakan COBIT 5 dengan Domain EDM03 dan APO12 (Studi Kasus Pada UPT-TIK Universitas Brawijaya),” J. Pengemb. Teknol. Inf. dan Ilmu Komput., vol. 4, no. 8, pp. 2329–2337, 2020, [Online]. Available: http://j-ptiik.ub.ac.id/index.php/j-ptiik/article/view/7621

N. S. FARERA MESSAKH, “Analisis Sistem Informasi Berbasis Cobit 5 (Studi Kasus?: LTC UKSW),” JATISI (Jurnal Tek. Inform. dan Sist. Informasi), vol. 8, no. 1, pp. 388–400, 2021, doi: 10.35957/jatisi.v8i1.654.

E. Zuraidah, “Audit Tata Kelola Teknologi Informasi Management Menggunakan Framework Cobit 5 Pada Pt Simona,” J. PROSISKO, vol. Vol. 10 No, no. 1, pp. 1–6, 2023.

M. H. Arief and Suprapto, “Evaluasi Manajemen Risiko Teknologi Informasi Menggunakan Kerangka Kerja COBIT 5 ( Studi Kasus Pada Perum Jasa Tirta I Malang ),” J. Pengemb. Teknol. Inf. dan Ilmu Komput., vol. 2, no. 1, pp. 101–109, 2018, [Online]. Available: https://garuda.ristekbrin.go.id/documents?q=Evaluasi+Manajemen+Risiko+Teknologi+Informasi+Menggunakan+Kerangka+Kerja+COBIT+5+%28Studi+Kasus+Pada+Perum+Jasa+Tirta+I+Malang%29

R. D. A. Putra, A. Ambarwati, and E. Setiawan, “Evaluasi Manajemen Risiko Teknologi Informasi Berdasarkan Framework COBIT 5 Pada PT.BTM,” JSI J. Sist. Inf., vol. 11, no. 2, pp. 1754–1762, 2019, doi: 10.36706/jsi.v11i2.9103.

J. Juminovario and E. S. Negara, “Manajemen Risiko Divisi Sistem Informasi Pada Universitas Bina Insan Menggunakan Framework Cobit 5,” CogITo Smart J., vol. 8, no. 2, pp. 491–500, 2022, doi: 10.31154/cogito.v8i2.435.491-500.

V. P. P. Wijaya, “Manajemen Risiko Teknologi Informasi Pada BTSI UKSW Menggunakan ISO 31000:2018,” JATISI (Jurnal Tek. Inform. dan Sist. Informasi), vol. 9, no. 2, pp. 1295–1307, 2022, doi: 10.35957/jatisi.v9i2.2087.

F. T. Riadi, A. D. Manuputty, and A. Saputra, “Evaluasi Manajemen Risiko Keamanan Informasi Dengan Menggunakan Framework Cobit 5 Subdomain Edm03 (Ensure Risk Optimisation),” J. Terap. Teknol. Inf., vol. 2, no. 1, pp. 12–21, 2018, doi: 10.21460/jutei.2018.21.53.


Bila bermanfaat silahkan share artikel ini

Berikan Komentar Anda terhadap artikel Analisis Manajemen Risiko TI Menggunakan Framework COBIT 5 Domain APO12 dan EDM03

Dimensions Badge

ARTICLE HISTORY


Published: 2023-12-15
Abstract View: 1158 times
PDF Download: 631 times

Most read articles by the same author(s)

1 2 > >>