Metode Earned Value Pada Pengendalian Proyek Pembangunan Gedung Sekolah SD Methodist-an Pancur Batu
Keywords:
Earned Value; Cost and Time of ImplementationAbstract
In a project it is necessary to identify a predictive data to obtain the provisions of the project being carried out in order to avoid the risk of failure or excess of the project that will be available, many mistakes and ignorance of the project control process that causes project work is not optimal , and often there is a lack of project funding and the time period provided is very long, thus making more losses, namely time and costs. So it is necessary to do analysis and calculation to find out how long the process takes and how much the cost will come out using the earned value (EV) method where this method will show the results of the CPI and SPI values ??which will later show the costs and how fast or slow the rate of a project and see the delay and the effect of the delay on the development of the construction project of the Pancur Batu Elementary School building.
Downloads
References
Aditya, O., & Naomi, P. (2017). Penerapan Manajemen Risiko Perusahaan dan Nilai Perusahaan di Sektor Konstruksi dan Properti. Esensi: Jurnal Bisnis Dan Manajemen, 7(2), 167–180. https://doi.org/10.15408/ess.v7i2.4981
Babar, S., Thaheem, M. J., & Ayub, B. (2017). Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001245
Batselier, J., & Vanhoucke, M. (2017). Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting. International Journal of Project Management, 35(1), 28–43. https://doi.org/10.1016/j.ijproman.2016.10.003
Fitriani, H., Sriwijaya, U., Marzuki, P. F., Wibowo, A., Pekerjaan, K., & Republik, U. (n.d.). J u r n a l Kajian Penerapan Model NPV-at-Risk Sebagai Alat Untuk Melakukan Evaluasi Investasi Pada Proyek Infrastruktur Jalan Tol Kajian Penerapan Model NPV-at-Risk Sebagai Alat Untuk Melakukan Evaluasi Investasi Pada Proyek Infrastruktur Jalan Tol. (March 2015).
Hasanah, H. (2017). TEKNIK-TEKNIK OBSERVASI (Sebuah Alternatif Metode Pengumpulan Data Kualitatif Ilmu-ilmu Sosial). At-Taqaddum, 8(1), 21. https://doi.org/10.21580/at.v8i1.1163
Hidayatullohi, T. (2019). EARNED VALUE PELAKSANAAN PROYEK PEMBANGUNAN KANTOR DENMA SESKOAD TNI AD DITINJAU DARI KINERJA. 3(1), 8–14.
Maromi, M. I., & Indriyani, R. (2015). Metode Earned Value untuk Analisa Kinerja Biaya dan Waktu Pelaksanaan pada Proyek Pembangunan Condotel De Vasa Surabaya. Jurnal Teknik ITS, 4(1), 54–59.
Natalia, M. … Hidayah, N. (2019). Analisis dan Evaluasi Kinerja Proyek Pembangunan Gedung Shelter SDN 27 Lengayang Pesisir Selatan dengan Metode Earned Value. Jurnal Teknik Sipil ITP, 6(2), 71–77. https://doi.org/10.21063/jts.2019.v602.05
Bila bermanfaat silahkan share artikel ini
Berikan Komentar Anda terhadap artikel Metode Earned Value Pada Pengendalian Proyek Pembangunan Gedung Sekolah SD Methodist-an Pancur Batu
ARTICLE HISTORY
Issue
Section
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under Creative Commons Attribution 4.0 International License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (Refer to The Effect of Open Access).