Metode Earned Value Pada Pengendalian Proyek Pembangunan Gedung Sekolah SD Methodist-an Pancur Batu


Authors

  • Jenni Veronika Br Ginting Ginting STMIK Kristen Neumann, Medan, Indonesia

Keywords:

Earned Value; Cost and Time of Implementation

Abstract

In a project it is necessary to identify a predictive data to obtain the provisions of the project being carried out in order to avoid the risk of failure or excess of the project that will be available, many mistakes and ignorance of the project control process that causes project work is not optimal , and often there is a lack of project funding and the time period provided is very long, thus making more losses, namely time and costs. So it is necessary to do analysis and calculation to find out how long the process takes and how much the cost will come out using the earned value (EV) method where this method will show the results of the CPI and SPI values ??which will later show the costs and how fast or slow the rate of a project and see the delay and the effect of the delay on the development of the construction project of the Pancur Batu Elementary School building.

Downloads

Download data is not yet available.

References

Aditya, O., & Naomi, P. (2017). Penerapan Manajemen Risiko Perusahaan dan Nilai Perusahaan di Sektor Konstruksi dan Properti. Esensi: Jurnal Bisnis Dan Manajemen, 7(2), 167–180. https://doi.org/10.15408/ess.v7i2.4981

Babar, S., Thaheem, M. J., & Ayub, B. (2017). Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001245

Batselier, J., & Vanhoucke, M. (2017). Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting. International Journal of Project Management, 35(1), 28–43. https://doi.org/10.1016/j.ijproman.2016.10.003

Fitriani, H., Sriwijaya, U., Marzuki, P. F., Wibowo, A., Pekerjaan, K., & Republik, U. (n.d.). J u r n a l Kajian Penerapan Model NPV-at-Risk Sebagai Alat Untuk Melakukan Evaluasi Investasi Pada Proyek Infrastruktur Jalan Tol Kajian Penerapan Model NPV-at-Risk Sebagai Alat Untuk Melakukan Evaluasi Investasi Pada Proyek Infrastruktur Jalan Tol. (March 2015).

Hasanah, H. (2017). TEKNIK-TEKNIK OBSERVASI (Sebuah Alternatif Metode Pengumpulan Data Kualitatif Ilmu-ilmu Sosial). At-Taqaddum, 8(1), 21. https://doi.org/10.21580/at.v8i1.1163

Hidayatullohi, T. (2019). EARNED VALUE PELAKSANAAN PROYEK PEMBANGUNAN KANTOR DENMA SESKOAD TNI AD DITINJAU DARI KINERJA. 3(1), 8–14.

Maromi, M. I., & Indriyani, R. (2015). Metode Earned Value untuk Analisa Kinerja Biaya dan Waktu Pelaksanaan pada Proyek Pembangunan Condotel De Vasa Surabaya. Jurnal Teknik ITS, 4(1), 54–59.

Natalia, M. … Hidayah, N. (2019). Analisis dan Evaluasi Kinerja Proyek Pembangunan Gedung Shelter SDN 27 Lengayang Pesisir Selatan dengan Metode Earned Value. Jurnal Teknik Sipil ITP, 6(2), 71–77. https://doi.org/10.21063/jts.2019.v602.05


Bila bermanfaat silahkan share artikel ini

Berikan Komentar Anda terhadap artikel Metode Earned Value Pada Pengendalian Proyek Pembangunan Gedung Sekolah SD Methodist-an Pancur Batu

Dimensions Badge

ARTICLE HISTORY


Published: 2020-07-27
Abstract View: 855 times
PDF Download: 915 times

Issue

Section

Articles